Guide · Updated 2026-10-02
Can One Training Matrix Cover Multiple Sites?
One training matrix can cover multiple sites when it is built around named people and portable requirements, with site-specific items (inductions, permits, local briefings) added as separate columns or filters. What fails is one spreadsheet per site that drifts out of sync — or one blob of columns nobody can filter by Monday morning.
Quick answer
Keep a single source of truth for worker identity, CSCS, plant tickets and other portable cards. Add site or project tags and site-only requirements beside them. Filter to the crew for Site A without maintaining a second “truth” file for Site B. If you need a starting layout, use a training matrix template and graduate to training matrix software when filters and evidence links break.
What belongs once versus per site
| Record type | Usually | Why |
|---|---|---|
| CSCS, IPAF, first aid, SMSTS | Once per person — portable | Follows the worker across sites |
| Company induction / role baseline | Once (or by role) | Not rewritten for every gate |
| PC / client induction | Per site or project | Local rules and packs differ |
| Local permit or brief | Per site — time-bound | Expires with the task or phase |
Ownership for a multi-site file
- One named matrix owner for the live file — not “whoever opened Excel last”
- Site admins update site-only columns; they do not fork the whole workbook
- H&S sets which portable requirements apply by role across the business
- A deputy is briefed before leave so Monday filters still run
- Finished sites are archived on a published close-out checklist
Avoid the multi-file trap
Emailing “Site B matrix.xlsx” as a fork of Site A is how CSCS dates diverge by Thursday. The portable ticket was renewed on Site A’s file and never copied. Use project or site fields so filters answer gate questions. Archive finished-site columns instead of deleting history — see archive completed site columns.
Setup checklist
- List portable requirements that follow the worker across every live site.
- List site-only requirements for each live contract, with clear names.
- Tag workers to current sites or gangs — not just a free-text notes cell.
- Create client inductions as separate requirements, not one shared tick.
- Test a Monday filter for one site before you scale to five.
- Publish who may edit the live file and where the archive lives.
Failure modes
- One workbook per site with no master identity list
- All inductions collapsed into a single “Inducted” column
- No project filter — supervisors scroll 400 rows every Monday
- Historic sites left live so gaps look worse than they are
- Two people editing different copies overnight
Example: civils gang across three compounds
A civils contractor runs three compounds under one employer. Portable tickets live once. Each compound has its own PC induction column. Monday mobilisation for Compound 2 filters worker type = operative, site = Compound 2, and shows gaps only for that gate. When Compound 1 closes, its induction column moves to archive; CSCS rows stay. Detail the filter habit in how to filter a matrix for one project or gang.
HSE context
Multi-site structure is an operational model for proving who meets assigned requirements where they will work. It does not replace risk assessment or client rules. For workplace health and safety expectations, start from HSE and your competent advice — then make the matrix match the requirements you actually assign.
Honest limits
FieldClear can hold one workforce view with filters and evidence. It does not decide which site rules apply or replace principal-contractor systems. Multi-site structure is your operational model. Not legal advice.
Already have a spreadsheet?
Upload your existing matrix and see who’s current, what’s expiring and what’s missing.
14-day free trial. No card required.