How to Archive Completed Site Columns on a Matrix
When a site closes, archive its project-specific columns instead of leaving them cluttering the live sheet. Move evidence into retention storage, mark the requirements inactive or historical, and keep the operational matrix limited to sites you still mobilise.
Quick answer
On demobilisation day: export or snapshot the site columns you need for retention, attach final evidence, then hide or deactivate those columns on the live matrix. Do not delete history to “tidy up” if audits may still ask for that project. Tie this to how long you keep site induction records and your ICO-aligned retention schedule for personal data.
What to archive versus keep live
- Archive: client inductions, site permits, project-only briefings
- Keep live: portable cards and role baselines that still apply
- Snapshot: a dated export of the crew as of last day on site
- Leave: gap notes that explain why someone never attended that site
- Preserve: evidence file paths so deputies can retrieve packs later
Ownership of close-out
| Role | Close-out job | Done looks like |
|---|---|---|
| Project admin | Final register and evidence pack complete | Every attendee has a file or LMS proof |
| Matrix owner | Columns deactivated; filters retested | Monday view excludes the finished site |
| Compliance | Retention path and period confirmed | Archive folder named and access listed |
| Deputy | Can find the snapshot without the owner | Handover note updated |
Spreadsheet habits that work
- Freeze an “Archive — Project X” tab or folder with the final columns.
- Prefix archived column headers so they never reappear in live filters.
- Record the archive date and owner in a change log.
- Confirm Monday mobilisation views no longer include that site.
- Store evidence under a path that includes year and project code.
- Do not paste archive data back into the live sheet “just in case”.
In software, inactive requirements or project tags usually beat cutting columns. The discipline is the same: live view for work still happening, archive for history. Training matrix software helps when Excel archive tabs become a second uncontrolled matrix.
Failure modes
- Deleting columns and evidence because the site “is finished”
- Leaving finished sites in Monday filters so every gang looks incomplete
- Archive tabs with no date, owner or project code
- Portable ticket columns archived by mistake with the site pack
- Nobody knows which SharePoint site holds the close-out export
Example: highways night-shift package ends
A twelve-week night-shift package ends Sunday. Project admin attaches final induction sheets. Matrix owner deactivates the package induction and permit columns, exports a dated crew snapshot, and leaves CSCS and traffic-management tickets live. Monday’s filter for remaining live packages no longer shows the closed job. Multi-site structure stays intact — see can one training matrix cover multiple sites.
HSE note
Archiving is document control, not a safety decision on its own. Keep enough evidence to show who was briefed for work that already happened. For wider health and safety management context, use HSE with your own competent advice.
Close-out checklist that survives audit
- List every project-only column for the finished site — inductions, permits, briefings.
- Confirm each attendee has attached evidence or a written gap reason.
- Export a dated crew snapshot and store it under year/project code.
- Deactivate or hide live columns; retest Monday filters for remaining sites.
- Leave portable cards (CSCS, IPAF, FAW) live — do not archive them with the site.
- Update the change log with archive date, owner and folder path.
- Brief the deputy once: where the pack lives and who owns retention questions.
- Schedule a 30-day spot check that the finished site no longer pollutes live views.
When not to archive yet
Do not archive while snagging gangs still need that site’s induction column, while a client close-out pack is incomplete, or while evidence filenames are still “IMG_4021”. Finish the pack first, then archive. Partial archives create two truths — a live sheet that still shows the site and a folder that looks closed. Align the cut-off with demobilisation day in the project plan, not with whoever remembers first.
Honest limits
FieldClear supports evidence and status on assigned requirements. It does not set how long you must retain project files or whether a client needs a close-out pack. Follow your retention policy. Not legal advice.
Already have a spreadsheet?
Upload your existing matrix and see who’s current, what’s expiring and what’s missing.
14-day free trial. No card required.